Project Details
This page displays current information for project DEA: 060W9104.
Project Information
Project Identifiers | Project ID: 995239 DEA: 060W9104 EFIS: 0618000011 |
---|---|
DIST-CO-RTE-PM | 06-TUL-99-27.6/30.6 |
Award Date | 09/17/2024 |
Closeout Date | Not set |
Work Description | HMA, RHMA-G, JOINTED PLAIN CONC PVMT (RSC) AND STBB (TYPE M). |
Location Description | TULARE COUNTY IN AND NEAR TULARE FROM PAIGE AVENUE OVERCROSSING TO PROSPERITY AVENUE OVERCROSSING. |
QA Service Level | 1 (Verified on 10/14/2024) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
amir.zamanian@dot.ca.gov | Amir Zamanian | Resident Engineer | Caltrans RE DB |
justin.palmaymesa@dot.ca.gov | Justin Palmaymesa | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 103 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2025-04-30-64 | 04/30/2025 | 05/19/2025 | Informational | Asphalt Binder | View |
2025-05-06-60 | 05/06/2025 | 05/19/2025 | Informational | Asphalt Binder | View |
2025-05-13-67 | 05/13/2025 | 05/19/2025 | Informational | Asphalt Binder | View |
2025-05-20-90 | 05/20/2025 | 06/18/2025 | Informational | Asphalt Binder | View |
2025-06-12-68 | 06/12/2025 | 06/18/2025 | Informational | Asphalt Binder | View |
2025-04-22-97 | 04/22/2025 | 05/19/2025 | Production Start-Up | Asphalt Binder | View |
2025-04-22-21 | 04/22/2025 | 04/23/2025 | Quality Assurance | Hot Mix Asphalt | View |
2025-04-22-22 | 04/22/2025 | 04/23/2025 | Quality Assurance | Hot Mix Asphalt | View |
2025-04-22-23 | 04/22/2025 | 04/23/2025 | Quality Assurance | Aggregate | View |
2025-04-24-12 | 04/24/2025 | 04/25/2025 | Quality Assurance | Aggregate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Precast Concrete Forms
Project DEA | DIME Sample ID | Sample Taken Date | Link |
---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods