Project Details
This page displays current information for project DEA: 120U1804.
Project Information
Project Identifiers | Project ID: 995233 DEA: 120U1804 EFIS: 1223000052 |
---|---|
DIST-CO-RTE-PM | 12-ORA-22,55-R3.3/R13.2,12.7/13.0 |
Award Date | 12/22/2023 |
Closeout Date | Not set |
Work Description | COLD PLANE AND REPLACE EXISTING PAVEMENT WITH RHMA AND HMA. |
Location Description | ORANGE COUNTY AT VARIOUS LOCATIONS |
QA Service Level | 1 (Verified on 10/16/2023) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
mike.ezzedine@dot.ca.gov | Mike Ezzedine | Resident Engineer | Caltrans RE DB |
danny.chung@dot.ca.gov | Danny Chung | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 20 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2024-03-04-21 | 03/04/2024 | 03/07/2024 | Verification | Aggregate | View |
2024-03-04-22 | 03/04/2024 | 03/07/2024 | Verification | Crumb Rubber Modifier | View |
2024-03-04-23 | 03/04/2024 | 03/07/2024 | Verification | Crumb Rubber Modifier | View |
2024-03-04-27 | 03/04/2024 | 03/08/2024 | Verification | Asphalt Binder | View |
2024-03-04-30 | 03/04/2024 | 03/08/2024 | Verification | Asphalt Rubber Binder | View |
2024-04-12-29 | 04/12/2024 | 04/15/2024 | Verification | Hot Mix Asphalt | View |
2024-04-12-30 | 04/12/2024 | 04/15/2024 | Verification | Aggregate | View |
2024-04-12-47 | 04/12/2024 | 04/15/2024 | Verification | Asphalt Binder | View |
2024-05-08-69 | 05/08/2024 | 05/08/2024 | Quality Assurance | Hot Mix Asphalt | View |
2024-05-09-66 | 05/09/2024 | 05/09/2024 | Quality Assurance | Hot Mix Asphalt | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods