Project Details
This page displays current information for project DEA: 07347904.
Project Information
Project Identifiers | Project ID: 995228 DEA: 07347904 EFIS: 0718000123 |
---|---|
DIST-CO-RTE-PM | 07-LA-405-31.2/41.4 |
Award Date | 03/07/2025 |
Closeout Date | Not set |
Work Description | COLD PLANE, PLACE HMA, RHMA, JPCP, ISR, & REPLACE BRIDGE SLABS. |
Location Description | LOS ANGELES FROM WILSHIRE BOULEVARD UNDERCROSSING TO VICTORY BOULEVARD UNDERCROSSING |
QA Service Level | 1 (Verified on 01/22/2024) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
sam.toutounchian@dot.ca.gov | Sam Toutounchian | Resident Engineer | Caltrans RE DB |
gon.choi@dot.ca.gov | Gon Choi | Structural Representative | Caltrans SR DB |
jennifer.olarte@dot.ca.gov | Jennifer Olarte | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
No results found. |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Precast Concrete Forms
Project DEA | DIME Sample ID | Sample Taken Date | Link |
---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods