Project Details

This page displays current information for project DEA: 044J5404.

Project Information

Project IdentifiersProject ID: 995203
DEA: 044J5404
EFIS: 0415000365
DIST-CO-RTE-PM04-ALA-880-27.0/27.4
Award Date01/08/2024
Closeout DateNot set
Work DescriptionINSTALL BARRIER, HOT MIX ASPHALT, AND DRAINAGE PIPE CULVERT.
Location DescriptionALAMEDA COUNTY IN OAKLAND FROM 0.4 MILE NORTH OF 66TH AVENUE OVERCROSSING TO 0.2 MILE SOUTH OF HIGH STREET SEPARATION AND OVERHEAD
QA Service Level1 (Verified on 10/17/2023)

Caltrans Project Personnel

Personnel stored in Caltrans' project databases.

Email AddressFull NameRolePersonnel Source
rui.zhang@dot.ca.govRui ZhangResident EngineerCaltrans RE DB
dylan.larose@dot.ca.govDylan LaroseMETS REPCaltrans METS REP DB

Samples

Samples submitted for this project.

Displaying 1-1 of 1 result.
DIME Sample IDSample Taken DateSample Received DateSample TypeMaterial TypeLink
   
2024-12-06-1412/06/202412/06/2024Quality AssuranceAggregateView

Job Mix Formula (JMF)

JMFs associated with this project.

JMF IDStatusSubmitted ByCreated ByDate CreatedLink
No results found.

Environmental Product Declaration (EPD)

EPDs material quantities submitted for this project.

Displaying 1-1 of 1 result.
Declaration NumberMaterial TypeVendorSubmitted byQuantity
EPD-191Carbon Steel RebarCMC Steel ArizonaC&N Reinforcing (Dawnette Galicia)28513 LBS

Project Summary Graphs


Samples Taken and Tests performed per Month


Number of Samples

Sample Types

Number of Tests

Test Types

Material Types

Test Methods