Project Details
This page displays current information for project DEA: 11430394.
Project Information
Project Identifiers | Project ID: 995067 DEA: 11430394 EFIS: 1118000115 |
---|---|
DIST-CO-RTE-PM | 11-SD-805-23.9/25.1 |
Award Date | 11/03/2023 |
Closeout Date | Not set |
Work Description | WIDEN FREEWAY, STRUCTURES, CONSTRUCT SIGNS, LANDSCAPE AND ELECTRICAL. |
Location Description | SAN DIEGO COUNTY IN SAN DIEGO FROM 0.2 MILE NORTH OF ROUTE 805/52 SEPARATION TO 0.3 MILE SOUTH OF NOBEL DRIVE OVERCROSSING |
QA Service Level | 1 (Verified on 12/19/2023) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
Tyler.Jones@dot.ca.gov | Tyler Jones | Resident Engineer | Caltrans RE DB |
carlos.guzman@dot.ca.gov | Carlos Guzman | Structural Representative | Caltrans SR DB |
kenneth.yu@dot.ca.gov | Kenneth Yu | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 34 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2025-02-27-30 | 02/27/2025 | 03/27/2025 | Quality Control | Aggregate | View |
2025-03-18-14 | 03/18/2025 | 03/20/2025 | Quality Control | Aggregate | View |
2025-03-18-13 | 03/18/2025 | 03/20/2025 | Quality Assurance | Hot Mix Asphalt | View |
2025-03-17-8 | 03/17/2025 | 03/18/2025 | Quality Control | Aggregate | View |
2025-03-17-7 | 03/17/2025 | 03/18/2025 | Quality Assurance | Hot Mix Asphalt | View |
2025-02-26-8 | 02/26/2025 | 02/28/2025 | Quality Control | Aggregate | View |
2025-02-26-7 | 02/26/2025 | 02/28/2025 | Quality Assurance | Hot Mix Asphalt | View |
2025-02-21-22 | 02/21/2025 | 02/27/2025 | Quality Control | Aggregate | View |
2025-02-23-2 | 02/23/2025 | 02/24/2025 | Quality Assurance | Hot Mix Asphalt | View |
2025-02-23-1 | 02/23/2025 | 02/24/2025 | Quality Assurance | Aggregate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods