Project Details
This page displays current information for project DEA: 081J9104.
Project Information
Project Identifiers | Project ID: 995061 DEA: 081J9104 EFIS: 0818000135 |
---|---|
DIST-CO-RTE-PM | 08-RIV,SBD-10,15,60,62,91,etc.-Var |
Award Date | 10/11/2023 |
Closeout Date | Not set |
Work Description | MODIFYING CMS SYSTEMS, SIGN FOUNDATION AND SIGN STRUCTURE. |
Location Description | RIVERSIDE AND SAN BERNARDINO COUNTIES AT VARIOUS LOCATIONS |
QA Service Level | 1 (Verified on 08/15/2023) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
george.salloum@dot.ca.gov | George Salloum | Resident Engineer | Caltrans RE DB |
joshua.fry@dot.ca.gov | Joshua Fry | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 35 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2024-07-25-79 | 07/25/2024 | 07/25/2024 | Quality Control | Aggregate | View |
2024-08-02-33 | 08/02/2024 | 08/02/2024 | Acceptance | Soil | View |
2024-07-31-16 | 07/31/2024 | 07/31/2024 | Acceptance | Soil | View |
2024-07-25-5 | 07/25/2024 | 07/25/2024 | Acceptance | Soil | View |
2024-06-28-83 | 06/28/2024 | 06/28/2024 | Acceptance | Soil | View |
2024-06-27-82 | 06/27/2024 | 06/27/2024 | Acceptance | Soil | View |
2024-06-25-113 | 06/25/2024 | 06/25/2024 | Acceptance | Soil | View |
2024-06-25-112 | 06/25/2024 | 06/25/2024 | Acceptance | Soil | View |
2024-06-21-78 | 06/21/2024 | 06/21/2024 | Acceptance | Soil | View |
2024-06-20-168 | 06/20/2024 | 06/20/2024 | Acceptance | Soil | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods