Project Details
This page displays current information for project DEA: 010K3104.
Project Information
Project Identifiers | Project ID: 995029 DEA: 010K3104 EFIS: 0120000062 |
---|---|
DIST-CO-RTE-PM | 01-MEN-101-30.8/R33.8 |
Award Date | 09/29/2023 |
Closeout Date | Not set |
Work Description | Calpella Cable Median Barrier |
Location Description | MENDOCINO COUNTY NEAR UKIAH FROM ROUTE 101/20 SEPARATION TO 0.1 MILE SOUTH OF UVA DRIVE/NORTH STATE STREET |
QA Service Level | 1 (Verified on 08/07/2023) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
daniel.kraft@dot.ca.gov | Daniel Kraft | Resident Engineer | Caltrans RE DB |
peter.gan@dot.ca.gov | Peter Gan | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-6 of 6 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2024-08-08-80 | 08/08/2024 | 07/24/2024 | Acceptance | Hot Mix Asphalt | View |
2024-08-07-100 | 08/07/2024 | 07/24/2024 | Acceptance | Hot Mix Asphalt | View |
2024-07-18-82 | 07/18/2024 | 07/24/2024 | Acceptance | Hot Mix Asphalt | View |
2024-07-17-99 | 07/17/2024 | 07/24/2024 | Acceptance | Hot Mix Asphalt | View |
2024-07-16-67 | 07/16/2024 | 07/23/2024 | Verification | Asphalt Binder | View |
2024-07-16-62 | 07/16/2024 | 07/19/2024 | Acceptance | Asphalt Binder | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods