Project Details
This page displays current information for project DEA: 081J2304.
Project Information
Project Identifiers | Project ID: 994944 DEA: 081J2304 EFIS: 0818000002 |
---|---|
DIST-CO-RTE-PM | 08-RIV-60-R1.0/12.0 |
Award Date | 09/20/2023 |
Closeout Date | Not set |
Work Description | RAMP METERING SYSTEM, HMA (TYPE A), RDWY EXC, MOD SIGNAL & LTG SYSTEMS |
Location Description | RIVERSIDE COUNTY IN AND NEAR JURUPA VALLEY AND RIVERSIDE AT VARIOUS LOCATIONS FROM WINEVILLE ROAD UNDERCROSSING TO 0.2 MILE WEST OF ROUTE 60/91 SEPARATION |
QA Service Level | 1 (Verified on 07/28/2023) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
mahfual.alam@dot.ca.gov | Mahfual Alam | Resident Engineer | Caltrans RE DB |
joshua.fry@dot.ca.gov | Joshua Fry | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 35 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2024-04-19-19 | 04/19/2024 | 04/19/2024 | Acceptance | Soil | View |
2024-04-17-29 | 04/17/2024 | 04/17/2024 | Acceptance | Soil | View |
2024-04-16-25 | 04/16/2024 | 04/16/2024 | Acceptance | Soil | View |
2024-04-16-26 | 04/16/2024 | 04/16/2024 | Acceptance | Soil | View |
2024-04-15-35 | 04/15/2024 | 04/15/2024 | Acceptance | Soil | View |
2024-04-15-36 | 04/15/2024 | 04/19/2024 | Production Start-Up | Hot Mix Asphalt | View |
2024-04-15-43 | 04/15/2024 | 04/15/2024 | Quality Control | Aggregate | View |
2024-04-15-48 | 04/15/2024 | 04/19/2024 | Verification | Asphalt Binder | View |
2024-04-15-51 | 04/15/2024 | 04/19/2024 | Verification | Aggregate | View |
2024-04-11-55 | 04/11/2024 | 04/11/2024 | Acceptance | Soil | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods