Project Details
This page displays current information for project DEA: 043J0704.
Project Information
Project Identifiers | Project ID: 994803 DEA: 043J0704 EFIS: 0415000077 |
---|---|
DIST-CO-RTE-PM | 04-CC-80-10.1/13.5 |
Award Date | 03/10/2023 |
Closeout Date | Not set |
Work Description | Remove PCC and AC, place PCP and AC Resurfacing. |
Location Description | Construction on State Highway in Contra Costa County in Hercules and Crockett from Route 80/4 separation to 0.1 mile west of Crockett Viaduct. |
QA Service Level | 1 (Verified on 05/10/2023) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
ta.seng@dot.ca.gov | Ta Seng | Resident Engineer | Caltrans RE DB |
dylan.larose@dot.ca.gov | Dylan Larose | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 81-90 of 426 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2023-10-13-56 | 10/13/2023 | 10/25/2023 | Quality Assurance | Hot Mix Asphalt | View |
2023-10-16-55 | 10/16/2023 | 10/24/2023 | Quality Assurance | Hot Mix Asphalt | View |
2023-10-20-71 | 10/20/2023 | 11/06/2023 | Quality Assurance | Hot Mix Asphalt | View |
2023-10-12-79 | 10/12/2023 | 11/01/2023 | Quality Assurance | Hot Mix Asphalt | View |
2023-10-13-55 | 10/13/2023 | 11/01/2023 | Quality Assurance | Hot Mix Asphalt | View |
2023-10-10-98 | 10/10/2023 | 10/31/2023 | Quality Assurance | Hot Mix Asphalt | View |
2023-10-17-78 | 10/17/2023 | 10/31/2023 | Quality Assurance | Hot Mix Asphalt | View |
2023-10-18-54 | 10/18/2023 | 10/31/2023 | Quality Assurance | Hot Mix Asphalt | View |
2023-10-09-85 | 10/09/2023 | 11/01/2023 | Quality Assurance | Hot Mix Asphalt | View |
2023-09-07-83 | 09/07/2023 | 09/07/2023 | Quality Assurance | Aggregate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods