Project Details
This page displays current information for project DEA: 120T1004.
Project Information
Project Identifiers | Project ID: 994759 DEA: 120T1004 EFIS: 1222000002 |
---|---|
DIST-CO-RTE-PM | 12-ORA-90,91-0.0-18.0 |
Award Date | 03/06/2023 |
Closeout Date | 01/03/2024 |
Work Description | Treat bridge, overlay with polyester concrete and replace joint seal. |
Location Description | ROUTE 90 AT ESPERANZA ROAD OVERHEAD AND ON ROUTE 91 FROM CARMENITA ROAD PEDESTRIAN OVERCROSSING TO COAL CANYON ROAD UNDERCROSSING |
QA Service Level | 1 (Verified on 04/28/2023) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
nabil.ruda@dot.ca.gov | Nabil Ruda | Resident Engineer | Caltrans RE DB |
danny.chung@dot.ca.gov | Danny Chung | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-3 of 3 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2023-05-18-72 | 05/18/2023 | 05/22/2023 | Quality Control | Polyester | View |
2023-06-01-50 | 06/01/2023 | 06/02/2023 | Quality Control | Methacrylate | View |
2023-06-13-25 | 06/13/2023 | 06/13/2023 | Quality Assurance | Polyester | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods