Project Details
This page displays current information for project DEA: 081M1704.
Project Information
Project Identifiers | Project ID: 994737 DEA: 081M1704 EFIS: 0821000086 |
---|---|
DIST-CO-RTE-PM | 08-RIV-15,71,91,215-Var |
Award Date | 06/30/2023 |
Closeout Date | 08/30/2024 |
Work Description | STRUCTURAL CONCRETE AND POLYESTER CONCRETE OVERLAY. |
Location Description | RIVERSIDE COUNTY AT VARIOUS LOCATIONS |
QA Service Level | 1 (Verified on 08/15/2023) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
mahfual.alam@dot.ca.gov | Mahfual Alam | Resident Engineer | Caltrans RE DB |
anton.schmieder@dot.ca.gov | Anton Schmieder | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 1-4 of 4 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2024-04-09-1 | 04/09/2024 | 04/16/2024 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
2024-03-28-4 | 03/28/2024 | 04/02/2024 | Quality Assurance | SMTL TM5 - Couplers | View |
2024-03-28-6 | 03/28/2024 | Quality Control | SMTL TM5 - Couplers | View | |
2024-03-28-9 | 03/28/2024 | Verification | SMTL TM5 - Couplers | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods