Project Details
This page displays current information for project DEA: 040Y3004.
Project Information
Project Identifiers | Project ID: 994731 DEA: 040Y3004 EFIS: 0422000265 |
---|---|
DIST-CO-RTE-PM | 04-SM-92-R10.4/R12.0 |
Award Date | 06/21/2023 |
Closeout Date | 03/04/2024 |
Work Description | COLD PLANE ASPHALT CONCRETE PAVEMENT AND OVERLAY WITH RHMA-G. |
Location Description | SAN MATEO COUNTY IN AND NEAR SAN MATEO FROM 0.2 MILE WEST OF ALAMEDA DE LAS PULGAS OVERCROSSING TO 92/101 SEPARATION |
QA Service Level | 1 (Verified on 05/09/2023) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
No results found. |
Samples
Samples submitted for this project.
Displaying 1-10 of 39 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2023-08-30-87 | 08/30/2023 | 08/31/2023 | Quality Assurance | Hot Mix Asphalt | View |
2023-08-30-86 | 08/30/2023 | 08/31/2023 | Quality Assurance | Aggregate | View |
2023-08-29-82 | 08/29/2023 | 08/30/2023 | Quality Assurance | Hot Mix Asphalt | View |
2023-08-29-81 | 08/29/2023 | 08/30/2023 | Quality Assurance | Aggregate | View |
2023-08-28-83 | 08/28/2023 | 08/29/2023 | Quality Assurance | Hot Mix Asphalt | View |
2023-08-28-82 | 08/28/2023 | 08/29/2023 | Quality Assurance | Aggregate | View |
2023-08-28-81 | 08/28/2023 | 08/29/2023 | Quality Assurance | Aggregate | View |
2023-08-25-62 | 08/25/2023 | 08/28/2023 | Quality Assurance | Hot Mix Asphalt | View |
2023-08-25-61 | 08/25/2023 | 08/28/2023 | Quality Assurance | Hot Mix Asphalt | View |
2023-08-24-68 | 08/24/2023 | 08/25/2023 | Quality Assurance | Hot Mix Asphalt | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods