Project Details
This page displays current information for project DEA: 033H7304.
Project Information
Project Identifiers | Project ID: 994642 DEA: 033H7304 EFIS: 0318000055 |
---|---|
DIST-CO-RTE-PM | 03-SAC-51-5.6/5.9 |
Award Date | 06/30/2023 |
Closeout Date | Not set |
Work Description | HMA, CLASS 2 AB, RDWY EXC, RCP AND CONCRETE BARRIER. |
Location Description | SACRAMENTO COUNTY IN SACRAMENTO FROM 0.1 MILE NORTH OF MARCONI AVENUE TO HOWE AVENUE |
QA Service Level | 1 (Verified on 05/15/2023) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
Jony.Tji@dot.ca.gov | Jony Tji | Resident Engineer | Caltrans RE DB |
elaine.yip@dot.ca.gov | Elaine Yip | Structural Representative | Caltrans SR DB |
justin.palmaymesa@dot.ca.gov | Justin Palmaymesa | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-7 of 7 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2024-07-18-54 | 07/18/2024 | 07/24/2024 | Quality Assurance | Concrete | View |
2024-07-22-29 | 07/22/2024 | 07/22/2024 | Quality Assurance | Concrete | View |
2024-05-15-107 | 05/15/2024 | 06/21/2024 | Quality Assurance | Hot Mix Asphalt | View |
2024-05-15-103 | 05/15/2024 | 05/16/2024 | Quality Assurance | Hot Mix Asphalt | View |
2024-05-15-52 | 05/15/2024 | 05/17/2024 | Quality Assurance | Hot Mix Asphalt | View |
2024-05-15-40 | 05/15/2024 | 05/17/2024 | Verification | Asphalt Binder | View |
2024-05-15-38 | 05/15/2024 | 05/15/2024 | Quality Assurance | Hot Mix Asphalt | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods