Project Details

This page displays current information for project DEA: 112N1214.

Project Information

Project IdentifiersProject ID: 994611
DEA: 112N1214
EFIS: 1121000171
DIST-CO-RTE-PM11-SD-94-39.0/R49.9
Award Date06/06/2023
Closeout Date06/11/2024
Work DescriptionMICROSURFACING, SHOULDER BACKING, RUMBLE STRIP, & STRIPING.
Location DescriptionSAN DIEGO NEAR POTRERO AND CANYON CITY FROM JUNCTION ROUTE 188 TO 3 MILES EAST OF CAMPO CREEK BRIDGE (BR NO. 57-0118)
QA Service Level1 (Verified on 07/18/2023)

Caltrans Project Personnel

Personnel stored in Caltrans' project databases.

Email AddressFull NameRolePersonnel Source
Fahad.Masud@dot.ca.govFahad MasudResident EngineerCaltrans RE DB

Samples

Samples submitted for this project.

Displaying 1-6 of 6 results.
DIME Sample IDSample Taken DateSample Received DateSample TypeMaterial TypeLink
   
2023-08-15-7808/15/202308/15/2023Quality AssuranceHot Mix AsphaltView
2023-08-15-7908/15/202308/15/2023Quality AssuranceAggregateView
2023-09-08-7109/08/202309/14/2023Quality AssuranceAggregateView
2023-09-11-10609/11/202309/14/2023Quality AssuranceAggregateView
2023-09-12-12609/12/202309/14/2023Quality AssuranceAggregateView
2023-09-14-9709/14/202309/14/2023Quality AssuranceAggregateView

Job Mix Formula (JMF)

JMFs associated with this project.

JMF IDStatusSubmitted ByCreated ByDate CreatedLink
No results found.

Environmental Product Declaration (EPD)

EPDs material quantities submitted for this project.

Declaration NumberMaterial TypeVendorSubmitted byQuantity
No results found.

Project Summary Graphs


Samples Taken and Tests performed per Month


Number of Samples

Sample Types

Number of Tests

Test Types

Material Types

Test Methods