Project Details
This page displays current information for project DEA: 112N1214.
Project Information
Project Identifiers | Project ID: 994611 DEA: 112N1214 EFIS: 1121000171 |
---|---|
DIST-CO-RTE-PM | 11-SD-94-39.0/R49.9 |
Award Date | 06/06/2023 |
Closeout Date | 06/11/2024 |
Work Description | MICROSURFACING, SHOULDER BACKING, RUMBLE STRIP, & STRIPING. |
Location Description | SAN DIEGO NEAR POTRERO AND CANYON CITY FROM JUNCTION ROUTE 188 TO 3 MILES EAST OF CAMPO CREEK BRIDGE (BR NO. 57-0118) |
QA Service Level | 1 (Verified on 07/18/2023) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
Fahad.Masud@dot.ca.gov | Fahad Masud | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
Displaying 1-6 of 6 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2023-09-14-97 | 09/14/2023 | 09/14/2023 | Quality Assurance | Aggregate | View |
2023-09-12-126 | 09/12/2023 | 09/14/2023 | Quality Assurance | Aggregate | View |
2023-09-08-71 | 09/08/2023 | 09/14/2023 | Quality Assurance | Aggregate | View |
2023-09-11-106 | 09/11/2023 | 09/14/2023 | Quality Assurance | Aggregate | View |
2023-08-15-79 | 08/15/2023 | 08/15/2023 | Quality Assurance | Aggregate | View |
2023-08-15-78 | 08/15/2023 | 08/15/2023 | Quality Assurance | Hot Mix Asphalt | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods