Project Details
This page displays current information for project DEA: 081C08U4.
Project Information
Project Identifiers | Project ID: 994586 DEA: 081C08U4 EFIS: 0822000142 |
---|---|
DIST-CO-RTE-PM | 08-RIV-10-R134.0/R156.5 |
Award Date | 06/22/2023 |
Closeout Date | Not set |
Work Description | PLACE HMA (TYPE A), JPCP, IMPORTED BORROW, ROADWAY EXCAVATION & CL2 AB |
Location Description | RIVERSIDE COUNTY FROM 1.1 MILES WEST OF WILEY WELL ROAD OVERCROSSING TO CALIFORNIA/ARIZONA STATE LINE |
QA Service Level | 1 (Verified on 08/02/2023) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
Ryan.Luis.Espoy@dot.ca.gov | Ryan Espoy (cc on Reports) | Resident Engineer | Caltrans RE DB |
joshua.fry@dot.ca.gov | Joshua Fry | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 25 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2024-10-03-58 | 10/03/2024 | 10/09/2024 | Verification | Aggregate | View |
2024-10-03-59 | 10/03/2024 | 10/09/2024 | Verification | Crumb Rubber Modifier | View |
2024-10-03-60 | 10/03/2024 | 10/09/2024 | Verification | Crumb Rubber Modifier | View |
2024-10-03-47 | 10/03/2024 | 10/08/2024 | Verification | Hot Mix Asphalt | View |
2024-09-06-29 | 09/06/2024 | 09/11/2024 | Quality Control | Concrete | View |
2024-09-04-105 | 09/04/2024 | 09/11/2024 | Quality Control | Concrete | View |
2024-09-05-97 | 09/05/2024 | 09/11/2024 | Quality Control | Concrete | View |
2024-09-11-89 | 09/11/2024 | 09/11/2024 | Quality Control | Concrete | View |
2024-08-26-63 | 08/26/2024 | 08/27/2024 | Quality Control | Concrete | View |
2024-08-27-67 | 08/27/2024 | 08/27/2024 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods