Project Details

This page displays current information for project DEA: 031H9904.

Project Information

Project IdentifiersProject ID: 994525
DEA: 031H9904
EFIS: 0317000043
DIST-CO-RTE-PM03-PLA,NEV-80-68.3/69.7,0.0/R2.7
Award Date11/07/2023
Closeout DateNot set
Work DescriptionRDWY EXC, PLACE HMA & JPCP, SLAB REPLACEMENT & POLYESTER CONC OVERLAY.
Location DescriptionPLACER AND NEVADA COUNTIES NEAR KINGVALE FROM 0.3 MILE WEST OF TROY UNDERCROSSING TO 0.2 MILE EAST OF SODA SPRINGS OVERCROSSING
QA Service Level1 (Verified on 05/15/2023)

Caltrans Project Personnel

Personnel stored in Caltrans' project databases.

Email AddressFull NameRolePersonnel Source
randie.babbini@dot.ca.govRandie BabbiniResident EngineerCaltrans RE DB
carl.c.anderson@dot.ca.govCarl AndersonStructural RepresentativeCaltrans SR DB
farzan.kazemi@dot.ca.govFarzan KazemiMETS REPCaltrans METS REP DB

Samples

Samples submitted for this project.

Displaying 1-10 of 62 results.
DIME Sample IDSample Taken DateSample Received DateSample TypeMaterial TypeLink
   
2025-04-30-1504/30/202505/01/2025Quality AssuranceSMTL TM5 - CouplersView
2025-04-30-1404/30/202505/01/2025Quality AssuranceSMTL TM5 - CouplersView
2025-04-30-1304/30/202505/01/2025Quality AssuranceSMTL TM5 - CouplersView
2025-04-30-1204/30/202505/01/2025Quality AssuranceSMTL TM5 - Headed BarsView
2025-03-04-2003/04/202504/17/2025Quality AssuranceSMTL TM3 - Fastener AssemblyView
2025-03-04-1903/04/202504/17/2025Quality AssuranceSMTL TM3 - Fastener AssemblyView
2025-03-04-1803/04/202504/17/2025Quality AssuranceSMTL TM3 - Fastener AssemblyView
2025-03-04-1703/04/202504/17/2025Quality AssuranceSMTL TM3 - Fastener AssemblyView
2025-03-04-1603/04/202504/17/2025Quality AssuranceSMTL TM3 - Fastener AssemblyView
2025-03-04-1503/04/202504/17/2025Quality AssuranceSMTL TM3 - Fastener AssemblyView

Job Mix Formula (JMF)

JMFs associated with this project.

Displaying 1-1 of 1 result.
JMF IDStatusSubmitted ByCreated ByDate CreatedLink
JMF3511-23-2025-14Submittal Authorized For Use CT D03 - Olivehurst Northern Regional Laboratory04/21/2025View

Precast Concrete Forms

Project DEADIME Sample IDSample Taken DateLink
No results found.

Project Summary Graphs


Samples Taken and Tests performed per Month


Number of Samples

Sample Types

Number of Tests

Test Types

Material Types

Test Methods