Project Details
This page displays current information for project DEA: 042Y9904.
Project Information
Project Identifiers | Project ID: 994494 DEA: 042Y9904 EFIS: 0423000186 |
---|---|
DIST-CO-RTE-PM | 04-SON-1-34.5, 34.5/34.5 |
Award Date | 01/10/2023 |
Closeout Date | Not set |
Work Description | Fort Ross Wall EFA |
Location Description | 11 miles north of Jenner |
QA Service Level | 1 (Verified on 03/13/2023) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
Fabio.LaSerna@dot.ca.gov | Fabio La Serna | Resident Engineer | Caltrans RE DB |
Matteo.Dorio@dot.ca.gov | Matteo D'Orio | Structural Representative | Caltrans SR DB |
waqas.ather@dot.ca.gov | Waqas Ather | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-2 of 2 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2023-05-22-3 | 05/22/2023 | 05/26/2023 | Quality Assurance | Concrete | View |
2023-06-30-4 | 06/30/2023 | 07/11/2023 | Quality Assurance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods