Project Details
This page displays current information for project DEA: 043Y0204.
Project Information
Project Identifiers | Project ID: 994493 DEA: 043Y0204 EFIS: 0423000189 |
---|---|
DIST-CO-RTE-PM | 04-SON-1-24.63/24.73 |
Award Date | Not set |
Closeout Date | Not set |
Work Description | Temporary shoring systems to support underground utility installation. |
Location Description | just north of Russian Gulch State Beach |
QA Service Level | 1 (Verified on 02/21/2023) |
Samples
Samples submitted for this project.
Displaying 1-1 of 1 result.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2023-05-11-36 | 05/11/2023 | 05/16/2023 | Quality Assurance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods