Project Details
This page displays current information for project DEA: 051Q0804.
Project Information
Project Identifiers | Project ID: 994486 DEA: 051Q0804 EFIS: 0522000148 |
---|---|
DIST-CO-RTE-PM | 05-SCR,SCR/SCR-9,1-17.41/17.5 |
Award Date | Not set |
Closeout Date | Not set |
Work Description | Repair of viaduct barrier wall and replace CIDH piles. Holiday Lane Viaduct Slipout. State Route 9 at PM SCR-09-8.4 Jay's Slide, and SR 236 (SCR-236-16.87) |
Location Description | Santa Cruz County. State Route 9 at PM SCR-09-8.4 and SR 236 (SCR-236-16.87) |
QA Service Level | 1 (Verified on 02/13/2023) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
ian.t.nguyen@dot.ca.gov | Ian Nguyen | Resident Engineer | Caltrans RE DB |
spozzo@mnsengineers.com | Stephen Pozzo | Structural Representative | Caltrans SR DB |
saman.barzegari@dot.ca.gov | Saman Barzegari | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-6 of 6 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2023-10-09-48 | 10/09/2023 | 10/20/2023 | Quality Assurance | SMTL TM1 - Elastomeric Bearing Pad | View |
2023-09-19-9 | 09/19/2023 | 09/22/2023 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
2023-09-19-8 | 09/19/2023 | 09/22/2023 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
2023-09-19-7 | 09/19/2023 | 09/22/2023 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
2023-02-22-14 | 02/22/2023 | 02/23/2023 | Quality Assurance | Concrete | View |
2023-02-17-16 | 02/17/2023 | 02/21/2023 | Quality Assurance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods