Project Details
This page displays current information for project DEA: 081A8304.
Project Information
Project Identifiers | Project ID: 994441 DEA: 081A8304 EFIS: 0800000579 COOP: 081746 |
---|---|
DIST-CO-RTE-PM | 08--- |
Award Date | 10/05/2022 |
Closeout Date | Not set |
Work Description | Widening the existing Cedar Avenue overcrossing (OC) from 6 to 10 lanes, replacing the Union Pacific Railroad overhead (OH), widening Cedar Avenue from 4 to 6 through lanes, and realigning and/or widening the interchange entrance and exit ramps |
Location Description | At the Interstate 10 (I-10) Cedar Avenue Interchange from PM 17.8 to 19.3 in the County of San Bernardino (County) |
QA Service Level | 2 (Verified on 12/13/2022) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
kee.ooi@dot.ca.gov | Kee Ooi | Resident Engineer | Caltrans RE DB |
Kenneth.Loncharich@wsp.com | Kenneth Loncharich | Oversight Resident Engineer | Caltrans REO DB |
matt.bruce@dot.ca.gov | Matt Bruce | Structural Representative | Caltrans SR DB |
Ali.El-Zaynab@wsp.com | Ali El-Zaynab | Oversight Structural Representative | Caltrans SRO DB |
jennifer.olarte@dot.ca.gov | Jennifer Olarte | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 19 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2023-06-05-30 | 06/05/2023 | 06/05/2023 | Quality Control | Concrete | View |
2023-06-05-35 | 06/05/2023 | 06/06/2023 | Quality Control | Concrete | View |
2023-06-07-43 | 06/07/2023 | 06/08/2023 | Quality Control | Concrete | View |
2023-06-09-18 | 06/09/2023 | 06/10/2023 | Quality Control | Concrete | View |
2023-06-13-41 | 06/13/2023 | 06/14/2023 | Quality Control | Concrete | View |
2023-06-15-21 | 06/15/2023 | 06/16/2023 | Quality Control | Concrete | View |
2023-06-19-24 | 06/19/2023 | 06/20/2023 | Quality Control | Concrete | View |
2023-06-21-24 | 06/21/2023 | 06/22/2023 | Quality Control | Concrete | View |
2023-08-02-39 | 08/02/2023 | 08/03/2023 | Quality Control | Concrete | View |
2023-08-03-27 | 08/03/2023 | 08/04/2023 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods