Project Details
This page displays current information for project DEA: 040K5204.
Project Information
Project Identifiers | Project ID: 994425 DEA: 040K5204 EFIS: 0416000098 |
---|---|
DIST-CO-RTE-PM | 04-SON-12-11.0/T17.4 |
Award Date | 03/21/2023 |
Closeout Date | Not set |
Work Description | Overlay with RHMA, replace guardrails, approach slabs and signs. |
Location Description | Construction on State Highway in Sonoma County from Llano Road to Farmers Lane. |
QA Service Level | 1 (Verified on 12/07/2022) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
anthony.tierra@dot.ca.gov | Anthony Tierra | Structural Representative | Caltrans SR DB |
waqas.ather@dot.ca.gov | Waqas Ather | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 21-30 of 65 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2024-02-24-15 | 02/24/2024 | 02/26/2024 | Quality Control | Concrete | View |
2024-02-25-2 | 02/25/2024 | 03/07/2024 | Quality Assurance | Concrete | View |
2024-02-25-3 | 02/25/2024 | 03/07/2024 | Quality Assurance | Concrete | View |
2024-02-25-4 | 02/25/2024 | 03/07/2024 | Quality Assurance | Concrete | View |
2024-02-25-5 | 02/25/2024 | 03/07/2024 | Quality Assurance | Concrete | View |
2024-02-25-6 | 02/25/2024 | 03/07/2024 | Quality Assurance | Concrete | View |
2024-03-20-92 | 03/20/2024 | 03/21/2024 | Quality Control | Aggregate | View |
2024-03-20-93 | 03/20/2024 | 03/21/2024 | Quality Control | Concrete | View |
2024-03-28-65 | 03/28/2024 | 03/29/2024 | Quality Control | Aggregate | View |
2024-03-28-66 | 03/28/2024 | 03/29/2024 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods