Project Details
This page displays current information for project DEA: 100X7514.
Project Information
Project Identifiers | Project ID: 994414 DEA: 100X7514 EFIS: 1015000128 |
---|---|
DIST-CO-RTE-PM | 10--VAR-0/0 |
Award Date | Not set |
Closeout Date | Not set |
Work Description | Upgrade bridge rails of three bridges |
Location Description | Calaveras County |
QA Service Level | 1 (Verified on 11/29/2022) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
iqbal.aulakh@dot.ca.gov | Iqbal Aulakh | Resident Engineer | Caltrans RE DB |
andre.totari@dot.ca.gov | Andre Totari | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 20 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2024-04-26-9 | 04/26/2024 | 04/29/2024 | Quality Assurance | Concrete | View |
2024-05-02-21 | 05/02/2024 | 05/06/2024 | Quality Assurance | Concrete | View |
2024-05-14-58 | 05/14/2024 | 05/16/2024 | Quality Assurance | Concrete | View |
2024-05-20-63 | 05/20/2024 | 05/21/2024 | Quality Assurance | Concrete | View |
2024-05-30-32 | 05/30/2024 | 06/03/2024 | Quality Assurance | Concrete | View |
2024-06-07-35 | 06/07/2024 | 06/10/2024 | Quality Assurance | Concrete | View |
2024-06-11-54 | 06/11/2024 | 06/13/2024 | Quality Assurance | Concrete | View |
2024-06-17-53 | 06/17/2024 | 06/18/2024 | Quality Assurance | Concrete | View |
2024-06-19-69 | 06/19/2024 | 06/21/2024 | Quality Assurance | Concrete | View |
2024-06-24-53 | 06/24/2024 | 06/25/2024 | Quality Assurance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods