Project Details
This page displays current information for project DEA: 100X7514.
Project Information
Project Identifiers | Project ID: 994414 DEA: 100X7514 EFIS: 1015000128 |
---|---|
DIST-CO-RTE-PM | 10--VAR-0/0 |
Award Date | Not set |
Closeout Date | Not set |
Work Description | Upgrade bridge rails of three bridges |
Location Description | Calaveras County |
QA Service Level | 1 (Verified on 11/29/2022) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
iqbal.aulakh@dot.ca.gov | Iqbal Aulakh | Resident Engineer | Caltrans RE DB |
andre.totari@dot.ca.gov | Andre Totari | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 20 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2024-08-05-37 | 08/05/2024 | 08/05/2024 | Acceptance | Roadway/Bridge Surface | View |
2024-07-26-23 | 07/26/2024 | 07/29/2024 | Quality Assurance | Concrete | View |
2024-07-22-31 | 07/22/2024 | 07/24/2024 | Quality Assurance | Concrete | View |
2024-07-19-28 | 07/19/2024 | 07/24/2024 | Quality Assurance | Concrete | View |
2024-07-18-32 | 07/18/2024 | 07/22/2024 | Quality Assurance | Concrete | View |
2024-07-15-24 | 07/15/2024 | 07/16/2024 | Quality Assurance | Concrete | View |
2024-07-10-33 | 07/10/2024 | 07/12/2024 | Quality Assurance | Concrete | View |
2024-07-02-22 | 07/02/2024 | 07/05/2024 | Quality Assurance | Concrete | View |
2024-06-28-43 | 06/28/2024 | 07/01/2024 | Quality Assurance | Concrete | View |
2024-06-26-43 | 06/26/2024 | 06/27/2024 | Quality Assurance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods