Project Details
This page displays current information for project DEA: 080F5414.
Project Information
Project Identifiers | Project ID: 994405 DEA: 080F5414 EFIS: 0800000137 COOP: 081743 |
---|---|
DIST-CO-RTE-PM | 08-RIV-- |
Award Date | 10/12/2022 |
Closeout Date | Not set |
Work Description | RIV 71/91 FLYOVER |
Location Description | Not set |
QA Service Level | 2 (Verified on 11/07/2022) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
mohsen.javaherneshan@dot.ca.gov | Mohsen Javaherneshan | Resident Engineer | Caltrans RE DB |
kpegg@falcon-ca.com | Kurt Pegg | Oversight Resident Engineer | Caltrans REO DB |
Anton.Schmieder@dot.ca.gov | Anton Schmieder | Structural Representative | Caltrans SR DB |
newton.armstrong@aecom.com | Newton Armstrong (Design) | Oversight Structural Representative | Caltrans SRO DB |
jennifer.olarte@dot.ca.gov | Jennifer Olarte | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 153 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2024-03-22-40 | 03/22/2024 | 04/05/2024 | Quality Control | Concrete | View |
2024-03-21-71 | 03/21/2024 | 04/05/2024 | Quality Control | Concrete | View |
2024-03-20-71 | 03/20/2024 | 04/05/2024 | Quality Control | Concrete | View |
2024-03-04-60 | 03/04/2024 | 03/22/2024 | Quality Control | Concrete | View |
2024-03-01-23 | 03/01/2024 | 03/15/2024 | Quality Control | Concrete | View |
2024-02-29-52 | 02/29/2024 | 03/15/2024 | Quality Control | Concrete | View |
2024-02-28-49 | 02/28/2024 | 03/15/2024 | Quality Control | Concrete | View |
2024-02-26-51 | 02/26/2024 | 03/15/2024 | Quality Control | Concrete | View |
2024-02-23-45 | 02/23/2024 | 03/08/2024 | Quality Control | Concrete | View |
2024-02-22-27 | 02/22/2024 | 03/08/2024 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Displaying 1-6 of 6 results.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
EPD-191 | Carbon Steel Rebar | CMC - Mesa | Surecast West (becki mastroleo) | 5779 LBS |
EPD-191 | Carbon Steel Rebar | CMC - Knoxville | Surecast West (becki mastroleo) | 1128 LBS |
EPD-191 | Carbon Steel Rebar | CMC - Knoxville | Surecast West (becki mastroleo) | 5685 LBS |
EPD-191 | Carbon Steel Rebar | CMC - Knoxville | Surecast West (becki mastroleo) | 5873 LBS |
EPD-191 | Carbon Steel Rebar | CMC - Knoxville | Surecast West (becki mastroleo) | 8597 LBS |
EPD-191 | Carbon Steel Rebar | CMC - Knoxville | Surecast West (becki mastroleo) | 1738 LBS |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods