Project Details
This page displays current information for project DEA: 07330304.
Project Information
Project Identifiers | Project ID: 994396 DEA: 07330304 EFIS: 0716000213 |
---|---|
DIST-CO-RTE-PM | 07-LA-10-22.0/30.8 |
Award Date | 10/09/2023 |
Closeout Date | Not set |
Work Description | CONSTRUCT CONCRETE BARRIER AND STRUCTURAL CONCRETE BARRIER SLAB. |
Location Description | LOS ANGELES COUNTY AT VARIOUS LOCATIONS FROM 0.6 MILE EAST OF ROUTE 710/10 SEPARATION TO 0.3 MILE WEST OF ROUTE 10/605 SEPARATION |
QA Service Level | 1 (Verified on 07/24/2023) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
edgar.herrera@dot.ca.gov | Edgar Herrera | Resident Engineer | Caltrans RE DB |
ryan.ramos@dot.ca.gov | Ryan Ramos | Structural Representative | Caltrans SR DB |
venkatesh.iyer@dot.ca.gov | Venkatesh Iyer | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 24 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2025-05-04-14 | 05/04/2025 | 05/04/2025 | Acceptance | Concrete | View |
2025-05-03-5 | 05/03/2025 | 05/03/2025 | Acceptance | Concrete | View |
2025-06-18-12 | 06/18/2025 | 06/18/2025 | Aggregate Prequalification Program | Aggregate | View |
2025-06-18-11 | 06/18/2025 | 06/18/2025 | Aggregate Prequalification Program | Aggregate | View |
2025-05-10-3 | 05/10/2025 | 05/10/2025 | Acceptance | Soil | View |
2024-12-17-18 | 12/17/2024 | 12/18/2024 | Acceptance | Aggregate | View |
2024-12-17-17 | 12/17/2024 | 12/18/2024 | Acceptance | Aggregate | View |
2024-12-17-16 | 12/17/2024 | 12/18/2024 | Acceptance | Aggregate | View |
2024-05-09-107 | 05/09/2024 | 05/13/2024 | Acceptance | Aggregate | View |
2024-05-09-106 | 05/09/2024 | 05/13/2024 | Acceptance | Aggregate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Precast Concrete Forms
Project DEA | DIME Sample ID | Sample Taken Date | Link |
---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods