Project Details

This page displays current information for project DEA: 051M4504.

Project Information

Project IdentifiersProject ID: 994394
DEA: 051M4504
EFIS: 0519000153
DIST-CO-RTE-PM05-SCR-236-5.4
Award Date01/18/2023
Closeout Date02/14/2024
Work DescriptionRETAINING WALL, PAVEMENT, DRAINAGE & PERMANENT EROSION CONTROL. Heartwood Hill
Location DescriptionSANTA CRUZ COUNTY NEAR BOULDER CREEK AT 1.1 MILES NORTH OF BOULDER CREEK BRIDGE
QA Service Level1 (Verified on 11/10/2022)

Caltrans Project Personnel

Personnel stored in Caltrans' project databases.

Email AddressFull NameRolePersonnel Source
farshad.keshavarzi@dot.ca.govFarshad KeshavarziResident EngineerCaltrans RE DB
jwilcenski@mnsengineers.comJames WilcenskiStructural RepresentativeCaltrans SR DB

Samples

Samples submitted for this project.

Displaying 1-10 of 16 results.
DIME Sample IDSample Taken DateSample Received DateSample TypeMaterial TypeLink
   
2023-08-18-9208/18/202308/19/2023Quality ControlAggregateView
2023-08-18-9308/18/202308/19/2023Quality ControlAggregateView
2023-08-18-9408/18/202308/18/2023Quality ControlConcreteView
2023-07-05-8907/05/202307/06/2023Quality ControlAggregateView
2023-07-05-9007/05/202307/06/2023Quality ControlAggregateView
2023-07-05-9107/05/202307/05/2023Quality ControlConcreteView
2023-06-30-7006/30/202307/01/2023Quality ControlAggregateView
2023-06-30-7106/30/202307/01/2023Quality ControlAggregateView
2023-06-30-7206/30/202306/30/2023Quality ControlConcreteView
2023-06-30-7306/30/202306/30/2023Quality ControlConcreteView

Job Mix Formula (JMF)

JMFs associated with this project.

JMF IDStatusSubmitted ByCreated ByDate CreatedLink
No results found.

Environmental Product Declaration (EPD)

EPDs material quantities submitted for this project.

Declaration NumberMaterial TypeVendorSubmitted byQuantity
No results found.

Project Summary Graphs


Samples Taken and Tests performed per Month


Number of Samples

Sample Types

Number of Tests

Test Types

Material Types

Test Methods