Project Details
This page displays current information for project DEA: 040K1204.
Project Information
Project Identifiers | Project ID: 994389 DEA: 040K1204 EFIS: 0416000054 |
---|---|
DIST-CO-RTE-PM | 04-ALA,CC-Various,4,13,24,80,160,etc-Various |
Award Date | 02/17/2023 |
Closeout Date | Not set |
Work Description | INSTALL RECTANGULAR RAPID FLASHING BEACON SYSTEMS. |
Location Description | ALAMEDA AND CONTRA COSTA COUNTIES AT VARIOUS LOCATIONS |
QA Service Level | 1 (Verified on 11/29/2022) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
rabindra.mukherjee@dot.ca.gov | Rabindra Mukherjee | Resident Engineer | Caltrans RE DB |
dylan.larose@dot.ca.gov | Dylan Larose | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
No results found. |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Displaying 1-1 of 1 result.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
4790066131.101.1 | Carbon Steel Rebar | Cascade Steel Rolling Mills, Incorporated | Perry Electric Incorporated (Melinda Cortessis) | 36135 pounds |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods