Project Details
This page displays current information for project DEA: 081G4704.
Project Information
Project Identifiers | Project ID: 994327 DEA: 081G4704 EFIS: 0816000001 |
---|---|
DIST-CO-RTE-PM | 08-RIV-74-3.1/53.5 |
Award Date | 01/02/2023 |
Closeout Date | Not set |
Work Description | STRUCTURAL CONC BR, CONC SLAB, HMA (TYPE A), ALT CRASH CUSHION SYSTEM. |
Location Description | RIVERSIDE COUNTY NEAR LAKE ELSINORE AT MORRILL CANYON BRIDGE AND NEAR HEMET AT STRAWBERRY CREEK BRIDGE. |
QA Service Level | 1 (Verified on 06/08/2023) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
mike.bergevin@dot.ca.gov | Mike A Bergevin | Resident Engineer | Caltrans RE DB |
arnel.vega@dot.ca.gov | Arnel Vega | Structural Representative | Caltrans SR DB |
joshua.fry@dot.ca.gov | Joshua Fry | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 31-40 of 69 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2024-01-26-26 | 01/26/2024 | 01/29/2024 | Quality Assurance | Concrete | View |
2024-03-20-35 | 03/20/2024 | 03/21/2024 | Quality Assurance | Concrete | View |
2023-12-21-26 | 12/21/2023 | 12/22/2023 | Quality Control | Concrete | View |
2023-12-29-23 | 12/29/2023 | 12/30/2023 | Quality Control | Concrete | View |
2024-01-10-68 | 01/10/2024 | 01/11/2024 | Quality Control | Concrete | View |
2023-12-14-64 | 12/14/2023 | 12/15/2023 | Quality Control | Concrete | View |
2023-12-29-24 | 12/29/2023 | 12/29/2023 | Quality Control | Aggregate | View |
2024-01-10-69 | 01/10/2024 | 01/10/2024 | Quality Control | Aggregate | View |
2023-12-14-65 | 12/14/2023 | 12/14/2023 | Quality Control | Aggregate | View |
2023-12-21-27 | 12/21/2023 | 12/21/2023 | Quality Control | Aggregate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods