Project Details
This page displays current information for project DEA: 051C3604.
Project Information
Project Identifiers | Project ID: 994326 DEA: 051C3604 EFIS: 0512000134 |
---|---|
DIST-CO-RTE-PM | 05-SB-217-0.9/1.4 |
Award Date | 01/31/2023 |
Closeout Date | Not set |
Work Description | REPLACE BRIDGE. |
Location Description | SANTA BARBARA COUNTY NEAR GOLETA FROM 0.2 MILE EAST OF GOLETA SLOUGH BRIDGE TO 0.4 MILE EAST OF SAN JOSE CREEK BRIDGE |
QA Service Level | 1 (Verified on 10/17/2022) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
manny.yogarajah@dot.ca.gov | Manny Yogarajah | Resident Engineer | Caltrans RE DB |
alis.chhay@dot.ca.gov | Alis Chhay | Structural Representative | Caltrans SR DB |
saman.barzegari@dot.ca.gov | Saman Barzegari | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 21-30 of 97 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2023-11-14-88 | 11/14/2023 | 11/14/2023 | Quality Control | Concrete | View |
2023-11-14-89 | 11/14/2023 | 11/14/2023 | Quality Control | Concrete | View |
2023-11-14-90 | 11/14/2023 | 11/14/2023 | Quality Control | Concrete | View |
2023-11-14-91 | 11/14/2023 | 11/14/2023 | Quality Control | Concrete | View |
2023-11-17-81 | 11/17/2023 | 11/17/2023 | Quality Control | Concrete | View |
2023-11-17-82 | 11/17/2023 | 11/17/2023 | Quality Control | Concrete | View |
2023-11-28-64 | 11/28/2023 | 11/28/2023 | Quality Control | Concrete | View |
2023-11-28-65 | 11/28/2023 | 11/28/2023 | Quality Control | Concrete | View |
2023-11-28-66 | 11/28/2023 | 11/28/2023 | Quality Control | Concrete | View |
2023-11-28-67 | 11/28/2023 | 11/28/2023 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods