Project Details
This page displays current information for project DEA: 080R1704.
Project Information
Project Identifiers | Project ID: 994311 DEA: 080R1704 EFIS: 0812000028 |
---|---|
DIST-CO-RTE-PM | 08-SBD-40-R25.0/R50.0 |
Award Date | 12/01/2022 |
Closeout Date | Not set |
Work Description | CONSTRUCT CSP, CSPA, SSPPA, STR CONC HW, IB, BFM, RSP, & MGS. |
Location Description | SAN BERNARDINO COUNTY AT NEWBERRY SPRINGS AND LUDLOW FROM 1.6 MILES EAST OF FORT CADY ROAD OVERCROSSING TO CRUCERO ROAD UNDERCROSSING |
QA Service Level | 1 (Verified on 07/28/2023) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
thanh.pham@dot.ca.gov | Thanh Pham | Resident Engineer | Caltrans RE DB |
joshua.fry@dot.ca.gov | Joshua Fry | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 11-20 of 62 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2024-01-29-8 | 01/29/2024 | 01/29/2024 | Department Acceptance | Aggregate | View |
2024-01-29-21 | 01/29/2024 | 01/31/2024 | Quality Assurance | Concrete | View |
2024-02-29-17 | 02/29/2024 | 03/01/2024 | Quality Assurance | Concrete | View |
2024-02-29-27 | 02/29/2024 | 02/29/2024 | Department Acceptance | Aggregate | View |
2024-03-07-13 | 03/07/2024 | 03/07/2024 | Department Acceptance | Aggregate | View |
2024-03-07-22 | 03/07/2024 | 03/08/2024 | Quality Assurance | Concrete | View |
2024-03-20-36 | 03/20/2024 | 03/21/2024 | Quality Assurance | Concrete | View |
2024-03-20-62 | 03/20/2024 | 03/20/2024 | Department Acceptance | Aggregate | View |
2024-04-04-28 | 04/04/2024 | 04/05/2024 | Quality Assurance | Concrete | View |
2024-04-08-33 | 04/08/2024 | 04/08/2024 | Quality Control | Aggregate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods