Project Details

This page displays current information for project DEA: 033H5404.

Project Information

Project IdentifiersProject ID: 994309
DEA: 033H5404
EFIS: 0318000012
DIST-CO-RTE-PM03-BUT-70-46.0/47.0
Award Date02/10/2023
Closeout DateNot set
Work DescriptionRAISE ALIGNMENT, PLACE HMA, STRUCTURAL CONCRETE & BRIDGE RAIL.
Location DescriptionBUTTE COUNTY NEAR PARADISE FROM 0.8 MILE WEST OF SHADY REST AREA TO 0.2 MILE EAST OF SHADY REST AREA
QA Service Level1 (Verified on 10/04/2022)

Caltrans Project Personnel

Personnel stored in Caltrans' project databases.

Email AddressFull NameRolePersonnel Source
daniel.rechs@dot.ca.govDaniel RechsResident EngineerCaltrans RE DB
adam.scardaci@dot.ca.govAdam ScardaciStructural RepresentativeCaltrans SR DB
farzan.kazemi@dot.ca.govFarzan KazemiMETS REPCaltrans METS REP DB

Samples

Samples submitted for this project.

Displaying 1-10 of 139 results.
DIME Sample IDSample Taken DateSample Received DateSample TypeMaterial TypeLink
   
2023-06-19-8106/19/202306/19/2023Quality ControlAggregateView
2023-06-19-8206/19/202306/19/2023Quality ControlAggregateView
2023-06-26-10506/26/202306/26/2023Quality ControlAggregateView
2023-06-26-10606/26/202306/26/2023Quality ControlAggregateView
2023-08-24-7508/24/202308/24/2023Quality ControlAggregateView
2023-08-24-7608/24/202308/24/2023Quality ControlAggregateView
2024-11-09-411/09/202411/19/2024Quality AssuranceAsphalt BinderView
2024-11-10-611/10/202411/19/2024Quality AssuranceAsphalt BinderView
2023-05-23-8605/23/202305/24/2023PreliminaryConcreteView
2023-07-14-607/14/202307/15/2023PreliminaryConcreteView

Job Mix Formula (JMF)

JMFs associated with this project.

Displaying 1-3 of 3 results.
JMF IDStatusSubmitted ByCreated ByDate CreatedLink
JMF3511-23-2025-18Submittal Authorized For Use CT D03 - Olivehurst Northern Regional Laboratory04/28/2025View
JMF3511-23-2024-41Submittal Authorized For Use CT D03 - Olivehurst Northern Regional Laboratory04/29/2024View
JMF3511-23-2024-36Submittal Authorized For Use CT D03 - Olivehurst Northern Regional Laboratory04/15/2024View

Project Summary Graphs


Samples Taken and Tests performed per Month


Number of Samples

Sample Types

Number of Tests

Test Types

Material Types

Test Methods