Project Details
This page displays current information for project DEA: 072XC004.
Project Information
Project Identifiers | Project ID: 994270 DEA: 072XC004 EFIS: 0723000026 |
---|---|
DIST-CO-RTE-PM | 07-LA,LA/LA-5-62.12/62.3, 61.5/64.3, R61.5R +R61.2L/R63.7R +R64.3L, R61.5R/R63.7R |
Award Date | 09/01/2022 |
Closeout Date | 11/07/2024 |
Work Description | LA-5 Remove and replace fire timber lagging retaining wall |
Location Description | I5N Near Castaic PM 62.12 and 62.3 |
QA Service Level | 1 (Verified on 09/19/2022) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
anahid.dermegerdichian@dot.ca.gov | Anahid Dermegerdichian | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 1-3 of 3 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2022-09-11-7 | 09/11/2022 | 11/08/2022 | Department Acceptance | Hot Mix Asphalt | View |
2022-10-22-4 | 10/22/2022 | 10/24/2022 | Department Acceptance | Concrete | View |
2022-10-24-39 | 10/24/2022 | 10/28/2022 | Department Acceptance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods