Project Details
This page displays current information for project DEA: 051K1204.
Project Information
Project Identifiers | Project ID: 994248 DEA: 051K1204 EFIS: 0518000125 |
---|---|
DIST-CO-RTE-PM | 05-SCR-9-1.0,4.0 |
Award Date | 12/07/2022 |
Closeout Date | Not set |
Work Description | CONSTRUCT SIDEHILL VIADUCTS. |
Location Description | SANTA CRUZ COUNTY AT 0.5 MILE NORTH OF VERNON STREET AND AT 0.8 MILE SOUTH OF GLENGARRY ROAD |
QA Service Level | 1 (Verified on 09/19/2022) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
farshad.keshavarzi@dot.ca.gov | Farshad Keshavarzi | Resident Engineer | Caltrans RE DB |
jwilcenski@mnsengineers.com | James Wilcenski | Structural Representative | Caltrans SR DB |
saman.barzegari@dot.ca.gov | Saman Barzegari | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 61-70 of 125 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2023-05-09-125 | 05/09/2023 | 05/10/2023 | Quality Control | Aggregate | View |
2023-05-09-126 | 05/09/2023 | 05/09/2023 | Quality Control | Concrete | View |
2023-05-10-86 | 05/10/2023 | 05/11/2023 | Quality Control | Aggregate | View |
2023-05-10-87 | 05/10/2023 | 05/11/2023 | Quality Control | Aggregate | View |
2023-05-10-88 | 05/10/2023 | 05/10/2023 | Quality Control | Concrete | View |
2023-05-11-104 | 05/11/2023 | 05/12/2023 | Quality Control | Aggregate | View |
2023-05-11-105 | 05/11/2023 | 05/12/2023 | Quality Control | Aggregate | View |
2023-05-11-106 | 05/11/2023 | 05/11/2023 | Quality Control | Concrete | View |
2023-05-12-102 | 05/12/2023 | 05/13/2023 | Quality Control | Aggregate | View |
2023-05-12-103 | 05/12/2023 | 05/13/2023 | Quality Control | Aggregate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Displaying 1-9 of 9 results.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
SCS-EPD-06643 | Carbon Steel Rebar | EVRAZ North America | CMC Rebar (TAMMY ARAGON) | 252 LBS |
EPD-191 | Carbon Steel Rebar | CMC - Mesa | CMC Rebar (TAMMY ARAGON) | 4635 LBS |
EPD-191 | Carbon Steel Rebar | CMC - Mesa | CMC Rebar (TAMMY ARAGON) | 10861 LBS |
EPD-191 | Carbon Steel Rebar | CMC - Mesa | CMC Rebar (TAMMY ARAGON) | 131912 LBS |
EPD-191 | Carbon Steel Rebar | CMC - Durant | CMC Rebar (TAMMY ARAGON) | 5982 LBS |
EPD-191 | Carbon Steel Rebar | CMC - Durant | CMC Rebar (TAMMY ARAGON) | 2991 LBS |
EPD-191 | Carbon Steel Rebar | CMC - Durant | CMC Rebar (TAMMY ARAGON) | 36189 LBS |
EPD-191 | Carbon Steel Rebar | CMC - Cayce | CMC Rebar (TAMMY ARAGON) | 446 LBS |
EPD-191 | Carbon Steel Rebar | CMC - Seguin | CMC Rebar (TAMMY ARAGON) | 25698 LBS |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods