Project Details
This page displays current information for project DEA: 051K1204.
Project Information
Project Identifiers | Project ID: 994248 DEA: 051K1204 EFIS: 0518000125 |
---|---|
DIST-CO-RTE-PM | 05-SCR-9-1.0,4.0 |
Award Date | 12/07/2022 |
Closeout Date | Not set |
Work Description | CONSTRUCT SIDEHILL VIADUCTS. |
Location Description | SANTA CRUZ COUNTY AT 0.5 MILE NORTH OF VERNON STREET AND AT 0.8 MILE SOUTH OF GLENGARRY ROAD |
QA Service Level | 1 (Verified on 09/19/2022) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
farshad.keshavarzi@dot.ca.gov | Farshad Keshavarzi | Resident Engineer | Caltrans RE DB |
jwilcenski@mnsengineers.com | James Wilcenski | Structural Representative | Caltrans SR DB |
saman.barzegari@dot.ca.gov | Saman Barzegari | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 125 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2023-11-01-110 | 11/01/2023 | 11/01/2023 | Quality Control | Concrete | View |
2023-10-30-93 | 10/30/2023 | 10/30/2023 | Quality Control | Concrete | View |
2023-10-10-111 | 10/10/2023 | 10/10/2023 | Quality Control | Concrete | View |
2023-09-08-69 | 09/08/2023 | 09/08/2023 | Quality Control | Concrete | View |
2023-07-17-73 | 07/17/2023 | 07/17/2023 | Quality Control | Concrete | View |
2023-06-21-91 | 06/21/2023 | 06/21/2023 | Quality Control | Concrete | View |
2023-12-05-18 | 12/05/2023 | 12/05/2023 | Department Acceptance | Roadway/Bridge Surface | View |
2023-05-06-19 | 05/06/2023 | 05/06/2023 | Quality Control | Concrete | View |
2023-09-08-61 | 09/08/2023 | 09/08/2023 | Quality Control | Concrete | View |
2023-09-08-60 | 09/08/2023 | 09/08/2023 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Displaying 1-9 of 9 results.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
SCS-EPD-06643 | Carbon Steel Rebar | EVRAZ North America | CMC Rebar (TAMMY ARAGON) | 252 LBS |
EPD-191 | Carbon Steel Rebar | CMC Steel Arizona | CMC Rebar (TAMMY ARAGON) | 4635 LBS |
EPD-191 | Carbon Steel Rebar | CMC Steel Arizona | CMC Rebar (TAMMY ARAGON) | 10861 LBS |
EPD-191 | Carbon Steel Rebar | CMC Steel Arizona | CMC Rebar (TAMMY ARAGON) | 131912 LBS |
EPD-191 | Carbon Steel Rebar | CMC - Durant | CMC Rebar (TAMMY ARAGON) | 5982 LBS |
EPD-191 | Carbon Steel Rebar | CMC - Durant | CMC Rebar (TAMMY ARAGON) | 2991 LBS |
EPD-191 | Carbon Steel Rebar | CMC - Durant | CMC Rebar (TAMMY ARAGON) | 36189 LBS |
EPD-191 | Carbon Steel Rebar | CMC - Cayce | CMC Rebar (TAMMY ARAGON) | 446 LBS |
EPD-191 | Carbon Steel Rebar | CMC - Seguin | CMC Rebar (TAMMY ARAGON) | 25698 LBS |