Project Details

This page displays current information for project DEA: 051H4304.

Project Information

Project IdentifiersProject ID: 994245
DEA: 051H4304
EFIS: 0516000073
DIST-CO-RTE-PM05-SB-101-21.4/21.9
Award Date03/02/2023
Closeout DateNot set
Work DescriptionREPLACE STRUCTURAL CONCRETE BRIDGES.
Location DescriptionSANTA BARBARA COUNTY IN GOLETA FROM ROUTE 101/217 SEPARATION TO 0.3 MILE NORTH OF SAN JOSE CREEK BRIDGE
QA Service Level1 (Verified on 09/19/2022)

Caltrans Project Personnel

Personnel stored in Caltrans' project databases.

Email AddressFull NameRolePersonnel Source
manny.yogarajah@dot.ca.govManny YogarajahResident EngineerCaltrans RE DB
Jose.Fabian.Velasco.Diaz@dot.ca.govFabian VelascoStructural RepresentativeCaltrans SR DB
saman.barzegari@dot.ca.govSaman BarzegariMETS REPCaltrans METS REP DB

Samples

Samples submitted for this project.

Displaying 1-10 of 63 results.
DIME Sample IDSample Taken DateSample Received DateSample TypeMaterial TypeLink
2023-06-01-206/01/202306/06/2023Quality AssuranceSMTL TM5 - Welded HoopsView
2023-05-22-6605/22/202305/31/2023Quality AssuranceSMTL TM1 - Elastomeric Bearing PadView
2023-09-14-309/14/202309/20/2023Quality AssuranceSMTL TM5 - Welded HoopsView
2023-10-03-910/03/202310/04/2023Quality AssuranceSMTL TM5 - Welded HoopsView
2023-10-05-310/05/202310/06/2023Quality AssuranceSMTL TM5 - Welded HoopsView
2023-10-06-310/06/202310/09/2023Quality AssuranceSMTL TM5 - Welded HoopsView
2023-10-10-210/10/202310/11/2023Quality AssuranceSMTL TM5 - Welded HoopsView
2023-10-12-410/12/2023Quality AssuranceSMTL TM5 - Threaded BarView
2023-10-30-110/30/202310/31/2023Quality AssuranceSMTL TM5 - Welded HoopsView
2023-11-01-811/01/202311/03/2023Quality AssuranceSMTL TM5 - Welded HoopsView

Job Mix Formula (JMF)

JMFs associated with this project.

JMF IDStatusSubmitted ByCreated ByDate CreatedLink
No results found.

Environmental Product Declaration (EPD)

EPDs material quantities submitted for this project.

Displaying 11-20 of 23 results.
Declaration NumberMaterial TypeVendorSubmitted byQuantity
SCS-EPD-09168Carbon Steel RebarVinton Steel, LLC.MCM Construction, Inc. (Emilio Gutierrez)931 lbs
SCS-EPD-09168Carbon Steel RebarVinton Steel, LLC.MCM Construction, Inc. (Emilio Gutierrez)16437 lbs
SCS-EPD-09168Carbon Steel RebarVinton Steel, LLC.MCM Construction, Inc. (Emilio Gutierrez)27668 lbs
4790066131.101.1 Carbon Steel RebarCascade Steel Rolling Mills, IncorporatedMCM Construction, Inc. (Emilio Gutierrez)1160 lbs
4790066131.101.1 Carbon Steel RebarCascade Steel Rolling Mills, IncorporatedMCM Construction, Inc. (Emilio Gutierrez)22010 lbs
4790066131.101.1 Carbon Steel RebarCascade Steel Rolling Mills, IncorporatedMCM Construction, Inc. (Emilio Gutierrez)9984 lbs
4790066131.101.1 Carbon Steel RebarCascade Steel Rolling Mills, IncorporatedMCM Construction, Inc. (Emilio Gutierrez)22010 lbs
4790066131.101.1 Carbon Steel RebarCascade Steel Rolling Mills, IncorporatedMCM Construction, Inc. (Emilio Gutierrez)20009 lbs
4790066131.101.1 Carbon Steel RebarCascade Steel Rolling Mills, IncorporatedMCM Construction, Inc. (Emilio Gutierrez)299 lbs
4790066131.101.1 Carbon Steel RebarCascade Steel Rolling Mills, IncorporatedMCM Construction, Inc. (Emilio Gutierrez)14586 lbs

Project Summary Graphs


Samples Taken and Tests performed per Month


Number of Samples

Sample Types

Number of Tests

Test Types

Material Types

Test Methods