Project Details
This page displays current information for project DEA: 051H4304.
Project Information
Project Identifiers | Project ID: 994245 DEA: 051H4304 EFIS: 0516000073 |
---|---|
DIST-CO-RTE-PM | 05-SB-101-21.4/21.9 |
Award Date | 03/02/2023 |
Closeout Date | Not set |
Work Description | San Jose Creek Bridge replacement |
Location Description | SANTA BARBARA COUNTY IN GOLETA FROM ROUTE 101/217 SEPARATION TO 0.3 MILE NORTH OF SAN JOSE CREEK BRIDGE |
QA Service Level | 1 (Verified on 09/19/2022) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
manny.yogarajah@dot.ca.gov | Manny Yogarajah | Resident Engineer | Caltrans RE DB |
Jose.Fabian.Velasco.Diaz@dot.ca.gov | Fabian Velasco | Structural Representative | Caltrans SR DB |
saman.barzegari@dot.ca.gov | Saman Barzegari | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 11-20 of 76 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2023-10-19-100 | 10/19/2023 | 10/19/2023 | Quality Control | Aggregate | View |
2023-10-12-107 | 10/12/2023 | 10/12/2023 | Quality Control | Aggregate | View |
2023-10-05-112 | 10/05/2023 | 10/05/2023 | Quality Control | Aggregate | View |
2024-01-30-2 | 01/30/2024 | 02/08/2024 | Quality Assurance | SMTL TM5 - Threaded Bar | View |
2023-12-18-1 | 12/18/2023 | 01/16/2024 | Quality Assurance | SMTL TM5 - Threaded Bar | View |
2023-12-11-2 | 12/11/2023 | Quality Control | SMTL TM5 - Welded Hoops | View | |
2023-12-11-1 | 12/11/2023 | 12/15/2023 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
2023-12-08-14 | 12/08/2023 | 12/01/2023 | Quality Control | Concrete | View |
2023-12-06-4 | 12/06/2023 | 12/01/2023 | Quality Control | Concrete | View |
2023-11-30-23 | 11/30/2023 | 12/01/2023 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Displaying 1-10 of 23 results.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
4790372675.101.1 | Carbon Steel Rebar | Nucor Steel, Incorporated - Plymouth | MCM Construction, Inc. (Emilio Gutierrez) | 13224 lbs |
4790372675.101.1 | Carbon Steel Rebar | Nucor Steel, Incorporated - Plymouth | MCM Construction, Inc. (Emilio Gutierrez) | 13224 lbs |
4790372675.101.1 | Carbon Steel Rebar | Nucor Steel, Incorporated - Plymouth | MCM Construction, Inc. (Emilio Gutierrez) | 827 lbs |
4790372675.101.1 | Carbon Steel Rebar | Nucor Steel, Incorporated - Plymouth | MCM Construction, Inc. (Emilio Gutierrez) | 13004 lbs |
4790372675.101.1 | Carbon Steel Rebar | Nucor Steel, Incorporated - Plymouth | MCM Construction, Inc. (Emilio Gutierrez) | 13004 lbs |
4790372675.101.1 | Carbon Steel Rebar | Nucor Steel, Incorporated - Plymouth | MCM Construction, Inc. (Emilio Gutierrez) | 10891 lbs |
SCS-EPD-09168 | Carbon Steel Rebar | Vinton Steel, LLC. | MCM Construction, Inc. (Emilio Gutierrez) | 22100 lbs |
SCS-EPD-09168 | Carbon Steel Rebar | Vinton Steel, LLC. | MCM Construction, Inc. (Emilio Gutierrez) | 22100 lbs |
SCS-EPD-09168 | Carbon Steel Rebar | Vinton Steel, LLC. | MCM Construction, Inc. (Emilio Gutierrez) | 1381 lbs |
SCS-EPD-09168 | Carbon Steel Rebar | Vinton Steel, LLC. | MCM Construction, Inc. (Emilio Gutierrez) | 26287 lbs |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods