Project Details
This page displays current information for project DEA: 051H4304.
Project Information
Project Identifiers | Project ID: 994245 DEA: 051H4304 EFIS: 0516000073 |
---|---|
DIST-CO-RTE-PM | 05-SB-101-21.4/21.9 |
Award Date | 03/02/2023 |
Closeout Date | Not set |
Work Description | San Jose Creek Bridge replacement |
Location Description | SANTA BARBARA COUNTY IN GOLETA FROM ROUTE 101/217 SEPARATION TO 0.3 MILE NORTH OF SAN JOSE CREEK BRIDGE |
QA Service Level | 1 (Verified on 09/19/2022) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
manny.yogarajah@dot.ca.gov | Manny Yogarajah | Resident Engineer | Caltrans RE DB |
Jose.Fabian.Velasco.Diaz@dot.ca.gov | Fabian Velasco | Structural Representative | Caltrans SR DB |
saman.barzegari@dot.ca.gov | Saman Barzegari | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 76 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2024-05-28-22 | 05/28/2024 | 05/31/2024 | Acceptance | Asphaltic Emulsion | View |
2024-05-30-9 | 05/30/2024 | 05/30/2024 | Acceptance | Roadway/Bridge Surface | View |
2023-10-24-111 | 10/24/2023 | 10/25/2023 | Quality Control | Concrete | View |
2023-12-06-50 | 12/06/2023 | 12/06/2023 | Quality Control | Aggregate | View |
2023-11-30-82 | 11/30/2023 | 11/30/2023 | Quality Control | Aggregate | View |
2023-11-21-76 | 11/21/2023 | 11/21/2023 | Quality Control | Aggregate | View |
2023-11-14-100 | 11/14/2023 | 11/14/2023 | Quality Control | Aggregate | View |
2023-11-06-96 | 11/06/2023 | 11/06/2023 | Quality Control | Aggregate | View |
2023-11-02-83 | 11/02/2023 | 11/02/2023 | Quality Control | Aggregate | View |
2023-10-26-128 | 10/26/2023 | 10/26/2023 | Quality Control | Aggregate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Displaying 1-10 of 23 results.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
4790372675.101.1 | Carbon Steel Rebar | Nucor Steel, Incorporated - Plymouth | MCM Construction, Inc. (Emilio Gutierrez) | 13224 lbs |
4790372675.101.1 | Carbon Steel Rebar | Nucor Steel, Incorporated - Plymouth | MCM Construction, Inc. (Emilio Gutierrez) | 13224 lbs |
4790372675.101.1 | Carbon Steel Rebar | Nucor Steel, Incorporated - Plymouth | MCM Construction, Inc. (Emilio Gutierrez) | 827 lbs |
4790372675.101.1 | Carbon Steel Rebar | Nucor Steel, Incorporated - Plymouth | MCM Construction, Inc. (Emilio Gutierrez) | 13004 lbs |
4790372675.101.1 | Carbon Steel Rebar | Nucor Steel, Incorporated - Plymouth | MCM Construction, Inc. (Emilio Gutierrez) | 13004 lbs |
4790372675.101.1 | Carbon Steel Rebar | Nucor Steel, Incorporated - Plymouth | MCM Construction, Inc. (Emilio Gutierrez) | 10891 lbs |
SCS-EPD-09168 | Carbon Steel Rebar | Vinton Steel, LLC. | MCM Construction, Inc. (Emilio Gutierrez) | 22100 lbs |
SCS-EPD-09168 | Carbon Steel Rebar | Vinton Steel, LLC. | MCM Construction, Inc. (Emilio Gutierrez) | 22100 lbs |
SCS-EPD-09168 | Carbon Steel Rebar | Vinton Steel, LLC. | MCM Construction, Inc. (Emilio Gutierrez) | 1381 lbs |
SCS-EPD-09168 | Carbon Steel Rebar | Vinton Steel, LLC. | MCM Construction, Inc. (Emilio Gutierrez) | 26287 lbs |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods