Project Details
This page displays current information for project DEA: 010H0214.
Project Information
Project Identifiers | Project ID: 994239 DEA: 010H0214 EFIS: 0118000107 |
---|---|
DIST-CO-RTE-PM | 01-HUM-169-19.0/33.0 |
Award Date | 12/07/2022 |
Closeout Date | Not set |
Work Description | Cappell Walls |
Location Description | HUMBOLDT COUNTY NEAR PECWAN FROM 3.4 MILES WEST OF CAPPELL CREEK BRIDGE TO 0.4 MILE EAST OF WEITCHPEC SCHOOL ROAD (Description of Work: Construct Soldier Pile Wall, Install Drainage, Place HMA (Type A)) |
QA Service Level | 1 (Verified on 09/22/2022) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
Efren.Banuelos@dot.ca.gov | Efren Banuelos | Resident Engineer | Caltrans RE DB |
Dustin.Helliwell@dot.ca.gov | Dustin Helliwell | Structural Representative | Caltrans SR DB |
peter.gan@dot.ca.gov | Peter Gan | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 28 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2024-09-06-6 | 09/06/2024 | 09/06/2024 | Quality Assurance | Concrete | View |
2023-12-15-16 | 12/15/2023 | 12/15/2023 | Quality Control | Concrete | View |
2023-11-08-19 | 11/08/2023 | 11/08/2023 | Quality Control | Concrete | View |
2023-11-07-45 | 11/07/2023 | 11/07/2023 | Quality Control | Concrete | View |
2023-11-06-14 | 11/06/2023 | 11/06/2023 | Quality Control | Concrete | View |
2023-11-03-11 | 11/03/2023 | 11/03/2023 | Quality Control | Concrete | View |
2023-11-02-12 | 11/02/2023 | 11/02/2023 | Quality Control | Concrete | View |
2023-11-01-47 | 11/01/2023 | 11/01/2023 | Quality Control | Concrete | View |
2023-10-31-14 | 10/31/2023 | 10/31/2023 | Quality Control | Concrete | View |
2023-10-27-1 | 10/27/2023 | 10/27/2023 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods