Project Details
This page displays current information for project DEA: 07354904.
Project Information
Project Identifiers | Project ID: 994200 DEA: 07354904 EFIS: 0719000001 |
---|---|
DIST-CO-RTE-PM | 07-LA-1-43.9/44.4 |
Award Date | 10/19/2022 |
Closeout Date | 09/24/2024 |
Work Description | UPGRADE SIGNAL POLES, HARDWARE AND INSTALL SPEED FEEDBACK DEVICE. |
Location Description | LOS ANGELES COUNTY IN MALIBU FROM 0.2 MILES SOUTH TO 0.3 MILES NORTH OF LAS FLORES CANYON ROAD |
QA Service Level | 1 (Verified on 09/20/2022) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
frank.shin@dot.ca.gov | Frank Shin | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
No results found. |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods