Project Details
This page displays current information for project DEA: 043Q8204.
Project Information
Project Identifiers | Project ID: 994184 DEA: 043Q8204 EFIS: 0419000266 COOP: 042804 |
---|---|
DIST-CO-RTE-PM | 04-ALA-580-R3.9 |
Award Date | Not set |
Closeout Date | Not set |
Work Description | Valley Link intends to establish new passenger rail service along a 42-mile corridor |
Location Description | Corridor between existing Dublin/Pleasanton BART Station and the approved North Lathrop Altamont Corridor Express (ACE) Station, in Alameda and San Joaquin Counties |
QA Service Level | 2 (Verified on 08/24/2022) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
saman.barzegari@dot.ca.gov | Saman Barzegari | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
No results found. |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods