Project Details
This page displays current information for project DEA: 051H8104.
Project Information
Project Identifiers | Project ID: 994166 DEA: 051H8104 EFIS: 0516000164 |
---|---|
DIST-CO-RTE-PM | 05-SBT-25-18.8/19.2 |
Award Date | 01/06/2023 |
Closeout Date | 07/31/2024 |
Work Description | ROADWAY EXCAVATION, HMA, CULVERTS AND SIGNAL SYSTEM. |
Location Description | SAN BENITO COUNTY ABOUT 32 MILES SOUTH OF HOLLISTER FROM 0.8 MILE NORTH OF SAN BENITO LATERAL TO 2 MILES SOUTH OF ROUTE 146 |
QA Service Level | 1 (Verified on 08/17/2022) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
baljinder.s.brar@dot.ca.gov | Baljinder S Brar | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
Displaying 1-2 of 2 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2023-11-03-17 | 11/03/2023 | 11/07/2023 | Quality Assurance | Asphalt Binder | View |
2023-11-04-16 | 11/04/2023 | 11/07/2023 | Quality Assurance | Asphaltic Emulsion | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods