Project Details
This page displays current information for project DEA: 051H8104.
Project Information
| Project Identifiers | Project ID: 994166 DEA: 051H8104 EFIS: 0516000164 |
|---|---|
| DIST-CO-RTE-PM | 05-SBT-25-18.8/19.2 |
| Award Date | 01/06/2023 |
| Closeout Date | 07/31/2024 |
| Work Description | ROADWAY EXCAVATION, HMA, CULVERTS AND SIGNAL SYSTEM. |
| Location Description | SAN BENITO COUNTY ABOUT 32 MILES SOUTH OF HOLLISTER FROM 0.8 MILE NORTH OF SAN BENITO LATERAL TO 2 MILES SOUTH OF ROUTE 146 |
| QA Service Level | 1 (Verified on 08/17/2022) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| baljinder.s.brar@dot.ca.gov | Baljinder S Brar | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
Displaying 1-2 of 2 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2023-11-03-17 | 11/03/2023 | 11/07/2023 | Quality Assurance | Asphalt Binder | View |
| 2023-11-04-16 | 11/04/2023 | 11/07/2023 | Quality Assurance | Asphaltic Emulsion | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
