Project Details
This page displays current information for project DEA: 044J9504.
Project Information
Project Identifiers | Project ID: 994142 DEA: 044J9504 EFIS: 0416000026 |
---|---|
DIST-CO-RTE-PM | 04-CC-4-R30.8/R40.4 |
Award Date | 09/22/2022 |
Closeout Date | 08/21/2023 |
Work Description | ROADWAY EXCAVATION, TEMPORARY BARRIER, AND HMA PAVING AT MVPS. |
Location Description | CONTRA COSTA COUNTY ON ROUTE 4 AT VARIOUS LOCATIONS FROM 0.4 MILE EAST OF ROUTE 160/4 SEPARATION TO HOFFMAN LANE |
QA Service Level | 1 (Verified on 08/08/2022) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
No results found. |
Samples
Samples submitted for this project.
Displaying 1-10 of 12 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2023-05-08-17 | 05/08/2023 | 05/08/2023 | Quality Assurance | Hot Mix Asphalt | View |
2023-05-08-23 | 05/08/2023 | 05/08/2023 | Quality Assurance | Aggregate | View |
2023-05-08-37 | 05/08/2023 | 05/08/2023 | Quality Assurance | Hot Mix Asphalt | View |
2023-05-08-59 | 05/08/2023 | 05/08/2023 | Quality Assurance | Hot Mix Asphalt | View |
2023-05-09-36 | 05/09/2023 | 05/09/2023 | Quality Assurance | Aggregate | View |
2023-05-09-47 | 05/09/2023 | 05/09/2023 | Quality Assurance | Hot Mix Asphalt | View |
2023-05-09-48 | 05/09/2023 | 05/09/2023 | Quality Assurance | Hot Mix Asphalt | View |
2023-05-09-49 | 05/09/2023 | 05/09/2023 | Quality Assurance | Hot Mix Asphalt | View |
2023-05-09-93 | 05/09/2023 | 05/09/2023 | Quality Assurance | Hot Mix Asphalt | View |
2023-05-10-18 | 05/10/2023 | 05/10/2023 | Quality Assurance | Hot Mix Asphalt | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods