Project Details
This page displays current information for project DEA: 043W5304.
Project Information
Project Identifiers | Project ID: 994128 DEA: 043W5304 EFIS: 0421000385 |
---|---|
DIST-CO-RTE-PM | 04-CC-680-1.09 |
Award Date | 01/19/2023 |
Closeout Date | 11/30/2023 |
Work Description | POLYESTER CONCRETE OVERLAY AND GRIND EXISTING CONCRETE PAVEMENT. |
Location Description | BRIDGE DECK PROGRAM |
QA Service Level | 1 (Verified on 08/08/2022) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
rabindra.mukherjee@dot.ca.gov | Rabindra Mukherjee | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 14 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2023-07-07-70 | 07/07/2023 | 06/29/2023 | Quality Assurance | Aggregate | View |
2023-06-29-61 | 06/29/2023 | 06/28/2023 | Quality Assurance | Hot Mix Asphalt | View |
2023-06-29-60 | 06/29/2023 | 07/05/2023 | Quality Assurance | Hot Mix Asphalt | View |
2023-06-28-76 | 06/28/2023 | 06/28/2023 | Quality Assurance | Hot Mix Asphalt | View |
2023-06-28-75 | 06/28/2023 | 06/28/2023 | Quality Assurance | Hot Mix Asphalt | View |
2023-06-28-74 | 06/28/2023 | 07/12/2023 | Quality Assurance | Hot Mix Asphalt | View |
2023-06-27-120 | 06/27/2023 | 06/29/2023 | Quality Assurance | Hot Mix Asphalt | View |
2023-06-27-119 | 06/27/2023 | 06/28/2023 | Quality Assurance | Hot Mix Asphalt | View |
2023-06-27-118 | 06/27/2023 | 06/30/2023 | Quality Assurance | Hot Mix Asphalt | View |
2023-06-26-95 | 06/26/2023 | 06/26/2023 | Quality Assurance | Aggregate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods