Project Details
This page displays current information for project DEA: 120P68U4.
Project Information
| Project Identifiers | Project ID: 994121 DEA: 120P68U4 EFIS: 1218000105 |
|---|---|
| DIST-CO-RTE-PM | 12-ORA-1-13.0/33.7 |
| Award Date | 07/12/2023 |
| Closeout Date | Not set |
| Work Description | COLD PLANE, PLACE RHMA AND MODIFY CURB RAMPS AND ELECTRICAL SYSTEMS. |
| Location Description | ORANGE COUNTY AT VARIOUS LOCATIONS FROM CRYSTAL HEIGHTS DRIVE TO LOS ANGELES/ORANGE COUNTY LINE |
| QA Service Level | 1 (Verified on 07/07/2023) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| christopher.blanco@dot.ca.gov | Christopher Blanco | Resident Engineer | Caltrans RE DB |
| vian.ghazi@dot.ca.gov | Vian Ghazi | Structural Representative | Caltrans SR DB |
| scott.bauer@dot.ca.gov | Scott Bauer | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 66 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2025-04-07-34 | 04/07/2025 | 04/11/2025 | Production Start-Up | Hot Mix Asphalt | View |
| 2025-04-18-31 | 04/18/2025 | 04/25/2025 | Production Start-Up | Hot Mix Asphalt | View |
| 2024-03-25-16 | 03/25/2024 | 03/26/2024 | Quality Assurance | Concrete | View |
| 2024-05-09-67 | 05/09/2024 | 05/10/2024 | Quality Assurance | Concrete | View |
| 2024-10-28-40 | 10/28/2024 | 10/29/2024 | Quality Assurance | Concrete | View |
| 2024-12-18-39 | 12/18/2024 | 12/18/2024 | Quality Assurance | Hot Mix Asphalt | View |
| 2024-12-19-27 | 12/19/2024 | 12/19/2024 | Quality Assurance | Hot Mix Asphalt | View |
| 2025-01-21-38 | 01/21/2025 | 01/22/2025 | Quality Assurance | Concrete | View |
| 2025-04-29-66 | 04/29/2025 | 04/30/2025 | Quality Assurance | Concrete | View |
| 2025-04-07-113 | 04/07/2025 | 04/07/2025 | Quality Assurance | Hot Mix Asphalt | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
