Project Details
This page displays current information for project DEA: 120P68U4.
Project Information
Project Identifiers | Project ID: 994121 DEA: 120P68U4 EFIS: 1218000105 |
---|---|
DIST-CO-RTE-PM | 12-ORA-1-13.0/33.7 |
Award Date | 07/12/2023 |
Closeout Date | Not set |
Work Description | COLD PLANE, PLACE RHMA AND MODIFY CURB RAMPS AND ELECTRICAL SYSTEMS. |
Location Description | ORANGE COUNTY AT VARIOUS LOCATIONS FROM CRYSTAL HEIGHTS DRIVE TO LOS ANGELES/ORANGE COUNTY LINE |
QA Service Level | 1 (Verified on 07/07/2023) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
christopher.blanco@dot.ca.gov | Christopher Blanco | Resident Engineer | Caltrans RE DB |
vian.ghazi@dot.ca.gov | Vian Ghazi | Structural Representative | Caltrans SR DB |
danny.chung@dot.ca.gov | Danny Chung | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 36 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2025-04-29-66 | 04/29/2025 | 04/30/2025 | Quality Assurance | Concrete | View |
2025-04-18-48 | 04/18/2025 | 04/25/2025 | Verification | Asphalt Rubber Binder | View |
2025-04-18-47 | 04/18/2025 | 04/25/2025 | Verification | Asphalt Binder | View |
2025-04-18-32 | 04/18/2025 | 04/25/2025 | Verification | Aggregate | View |
2025-04-18-31 | 04/18/2025 | 04/25/2025 | Production Start-Up | Hot Mix Asphalt | View |
2025-04-07-62 | 04/07/2025 | 04/14/2025 | Verification | Asphalt Binder | View |
2025-04-07-52 | 04/07/2025 | 04/11/2025 | Verification | Asphalt Rubber Binder | View |
2025-04-07-37 | 04/07/2025 | 04/11/2025 | Verification | Aggregate | View |
2025-04-07-34 | 04/07/2025 | 04/11/2025 | Production Start-Up | Hot Mix Asphalt | View |
2025-02-06-25 | 02/06/2025 | 02/11/2025 | Verification | Asphalt Rubber Binder | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Precast Concrete Forms
Project DEA | DIME Sample ID | Sample Taken Date | Link |
---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods