Project Details
This page displays current information for project DEA: 010J4104.
Project Information
Project Identifiers | Project ID: 994116 DEA: 010J4104 EFIS: 0119000025 |
---|---|
DIST-CO-RTE-PM | 01-HUM-299-30.7/33.4 |
Award Date | 11/23/2022 |
Closeout Date | Not set |
Work Description | Project Name: HUM-299 Curve Improvement |
Location Description | HUMBOLDT COUNTY NEAR WILLOW CREEK FROM 0.1 MILE EAST OF CEDAR CREEK ROAD TO 0.1 MILE EAST OF EAST FORK WILLOW CREEK BRIDGE |
QA Service Level | 1 (Verified on 07/29/2022) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
ethan.retherford@dot.ca.gov | Ethan Retherford | Resident Engineer | Caltrans RE DB |
laura.cangas@dot.ca.gov | Laura Cangas | Structural Representative | Caltrans SR DB |
peter.gan@dot.ca.gov | Peter Gan | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 11-20 of 240 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2023-06-26-8 | 06/26/2023 | 06/26/2023 | Quality Control | Concrete | View |
2023-06-27-35 | 06/27/2023 | 06/27/2023 | Quality Control | Concrete | View |
2023-06-28-5 | 06/28/2023 | 06/28/2023 | Quality Control | Concrete | View |
2023-06-29-10 | 06/29/2023 | 06/29/2023 | Quality Control | Concrete | View |
2023-06-30-5 | 06/30/2023 | 06/30/2023 | Quality Control | Concrete | View |
2023-06-30-6 | 06/30/2023 | 06/30/2023 | Quality Control | Concrete | View |
2023-07-05-10 | 07/05/2023 | 07/05/2023 | Quality Control | Concrete | View |
2023-07-06-3 | 07/06/2023 | 07/06/2023 | Quality Control | Concrete | View |
2023-07-07-2 | 07/07/2023 | 07/07/2023 | Quality Control | Concrete | View |
2023-07-10-7 | 07/10/2023 | 07/10/2023 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods