Project Details
This page displays current information for project DEA: 060W1704.
Project Information
Project Identifiers | Project ID: 994109 DEA: 060W1704 EFIS: 0617000103 |
---|---|
DIST-CO-RTE-PM | 06-FRE-41-R27.4/R28.5 |
Award Date | 11/10/2022 |
Closeout Date | Not set |
Work Description | REMOVE AC PAVEMENT, WIDEN TRAVEL WAY, AND CONSTRUCT RETAINING WALL. |
Location Description | FRESNO COUNTY IN FRESNO FROM 0.1 MILE SOUTH OF ASHLAN AVENUE OVERCROSSING TO SHAW AVENUE OVERCROSSING |
QA Service Level | 1 (Verified on 07/13/2022) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
mark.mengoni@dot.ca.gov | Mark Mengoni | Resident Engineer | Caltrans RE DB |
benjamin.holton@anseradvisory.com | Benjamin Holton | Structural Representative | Caltrans SR DB |
justin.palmaymesa@dot.ca.gov | Justin Palmaymesa | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 41-50 of 76 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2024-03-20-33 | 03/20/2024 | 03/21/2024 | Department Acceptance | Concrete | View |
2023-04-19-21 | 04/19/2023 | 04/20/2023 | Quality Assurance | Hot Mix Asphalt | View |
2023-04-19-22 | 04/19/2023 | 04/20/2023 | Quality Assurance | Hot Mix Asphalt | View |
2023-04-19-23 | 04/19/2023 | 04/20/2023 | Quality Assurance | Hot Mix Asphalt | View |
2023-04-19-78 | 04/19/2023 | 04/27/2023 | Dispute Resolution | Hot Mix Asphalt | View |
2023-05-02-4 | 05/02/2023 | 05/05/2023 | Quality Assurance | SMTL TM5 - Threaded Bar | View |
2023-07-31-3 | 07/31/2023 | 08/02/2023 | Authorization | SMTL TM5 - Threaded Bar | View |
2023-08-22-1 | 08/22/2023 | 08/22/2023 | Quality Assurance | SMTL TM5 - Threaded Bar | View |
2023-03-28-15 | 03/28/2023 | 03/28/2023 | Department Acceptance | Soil | View |
2023-03-30-32 | 03/30/2023 | 03/30/2023 | Department Acceptance | Soil | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Displaying 1-10 of 24 results.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
EPD-191 | Carbon Steel Rebar | CMC Steel Arizona | CMC Rebar (TAMMY ARAGON) | 20513 lb |
EPD-191 | Carbon Steel Rebar | CMC Steel Arizona | CMC Rebar (TAMMY ARAGON) | 24586 lbs |
EPD-191 | Carbon Steel Rebar | CMC Steel Arizona | CMC Rebar (TAMMY ARAGON) | 5387 lbs |
EPD-191 | Carbon Steel Rebar | CMC Steel Arizona | CMC Rebar (Maria Sanchez) | 30,196 LBS |
EPD-191 | Carbon Steel Rebar | CMC Steel Arizona | CMC Rebar (Maria Sanchez) | 1,376 LBS |
EPD-191 | Carbon Steel Rebar | CMC Steel Arizona | CMC Rebar (Maria Sanchez) | 267 LBS |
EPD-191 | Carbon Steel Rebar | CMC Steel Arizona | CMC Rebar (TAMMY ARAGON) | 13600 lbs |
EPD-191 | Carbon Steel Rebar | CMC Steel Arizona | CMC Rebar (TAMMY ARAGON) | 184 lbs |
EPD-191 | Carbon Steel Rebar | CMC Steel Arizona | CMC Rebar (TAMMY ARAGON) | 184 lbs |
EPD-191 | Carbon Steel Rebar | CMC Steel Arizona | CMC Rebar (TAMMY ARAGON) | 13600 lbs |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods