Project Details
This page displays current information for project DEA: 043Q8404.
Project Information
Project Identifiers | Project ID: 994106 DEA: 043Q8404 EFIS: 0419000271 COOP: 042768 |
---|---|
DIST-CO-RTE-PM | 04-ALA-980-1.8/1.9 |
Award Date | Not set |
Closeout Date | Not set |
Work Description | BART'S NEW HIGH VOLTAGE TRACTION POWER SUBSTATION |
Location Description | UNDER THE RAMP FROM EASTBOUND I-580 TO SOUTHBOUND I-980 RAMP STRUCTURE SOUTH OF 34TH STREET IN OAKLAND |
QA Service Level | 2 (Verified on 09/20/2022) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
saman.barzegari@dot.ca.gov | Saman Barzegari | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
No results found. |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods